It’s so exciting to see work begin on the Eugene Safe Routes to School infrastructure projects!  These projects came out of school action plans, surveys and tallies that were done by 7 area schools in 2009 & 2010. A grant that the City of Eugene wrote along with the 4J school district was awarded in the summer of 2010 and in one of the fastest turn-arounds of these SRTs infrastructure projects yet the City of Eugene began work this Spring to implement the projects and hope to have them all completed by the end of this summer.

Here is a list of some of the projects followed by a new video put out by the Portland Bureau of Transportation and Animated Traffic Law Center (based in Eugene) about the Rapid Flashing Beacons (RFB) being put in at several locations with this grant. PBOT also has a good description of RFBs on their website.

Roosevelt Middle School

1.      30th and Alder crossing improvements (including RFB)
2.      28th and Hilyard crossing improvements (including RFB)
3.      New bike racks (for the DesignBridge built covered parking)

Monroe Middle School

1.      Oakway and Lariat crossing improvements
2.      Oakway and Bedford Way crossing improvements
3.      Willakenzie at Bogart crossing improvements
4.      Van Avenue to Roundup Drive new path paving
5.      Wayfinding signage

Edison Elementary

1.      22nd and Agate crossing improvements (including RFB)
2.      23rd and Harris crossing improvements
3.      22nd at Onyx and Emerald crossing improvements
4.      23rd at Onyx and Emerald crossing improvements

Camas Ridge Elementary

1.      30th and Alder Crossing improvements (including RFB)
2.      28th and Hilyard crossing improvements (including RFB)
3.      29th and Harris crossing improvements
4.      New bike racks (for the DesignBridge built covered parking)

César Chávez

1.      15th and Chambers crossing improvements (including RFB)
2.      Path construction from 15th crossing to school (through park)
3.      18th and Friendly crossing improvements

McCornack Elementary

1.      New path around parking lot remove driveway hazards
2.      Path improvements from Westleigh to school property
3.      Crossing improvements between at Todd St. and Ellen Ave.
4.      Covered bicycle parking & racks

Buena Vista Elementary

1.      Raised crossing at school parking lot
2.      Restripe parking lot with crosswalks and install directional signage
3.      Speed reader boards on Cal Young near Queens Way

Learn more about rapid flash beacons on PBOT’s website.